Sewage collector by the method of shield passage, as part of the construction of the tram in Sikhiv.

SEE THE PROJECT

IMPLEMENTATION DESCRIPTION

In Lviv, as part of the implementation of the project for the construction of a tram track in the Sikhiv district, a sewage collector was laid using the shield passing method. The works were carried out on the section from Uhorska Street to Lypkova Aleya Street.

The old sewage collector of 1985 could not withstand the load and could fail at any time. Therefore, a new one was built parallel to the existing collector, at the level of 15 m underground.

A closed collector was built for the first time in Lviv. This technology eliminates the need to carry out a complex of works related to traditional technologies. Unlike conducting works in an open manner, it does not require dissection of the surface along the entire route of laying communications.

For the construction of the new mine, Abeton manufactured mine shafts D5.5 – SK 55. And the primary treatment of the collector was made from Abeton OK 2.15 tubing – 900 m long and 1.6 m in diameter.

Mine shafts and tubing were manufactured and delivered to the object in the shortest possible time. Quality products will serve for a long time and reliably, once again confirming that ABETON – STRONG PARTNER IN CONSTRUCTION!

SEE INFORMATION
CONTACT US
info@abeton.ua
IMPLEMENTATION INFORMATION
Time for completion:

2016
Place of implementation:

Lviv, Sikhiv
General contractor:

Lvivavtodor
Range of services:

production, transport