GROSSLIT HEADWALLS OF THE INDIVIDUAL PRODUCTION CANALISATION COLLECTIVE, LINED WITH ANCHOR POLYETHYLENE, Kyiv, Verbova str.

During the construction of a complex of multi-storey residential buildings in Kyiv, ABETON manufactured and supplied individually designed Grosslit chambers that meet all technical requirements and provide reliable protection against the aggressive effects of wastewater.

SEE THE PROJECT

IMPLEMENTATION DESCRIPTION

During the construction of a complex of multi-storey residential buildings in Kyiv, there was a need to reconstruct the sewerage network, namely the arrangement of non-standard collector necks to ensure quality maintenance and its uninterrupted operation.

To implement this task, ABETON designed, manufactured and supplied individual monolithic Grosslit chambers that meet all technical requirements and provide reliable protection against aggressive sewage.

 

TECHNICAL FEATURES

 

✔ Individual production – two necks according to project requirements:

First chamber: length 2500 mm, width 1400 mm, height 2500 mm.

Second chamber: length 1600 mm, width 1400 mm, height 2500 mm.

The wall thickness is 200 mm, which guarantees the strength and reliability of the structure.

 

✔ Corrosion protection – internal lining with anchor polyethylene, which prevents the destructive effects of domestic wastewater.

 

✔ High quality workmanship – the developed technical solution has been examined and successfully implemented in accordance with all standards and requirements.

 

 

SUCCESSFUL PROJECT IMPLEMENTATION

 

ABETON specialists developed an effective design solution, ensured high-quality production and prompt delivery of the necks, which allowed us to successfully complete the reconstruction of the collector as part of the construction of a residential complex.

 

ABETON IS A STRONG PARTNER IN THE CONSTRUCTION OF MODERN INFRASTRUCTURE!

 

#implementation #ABETON #reinforced concrete #construction #Grosslit chamber #sewerage #water supply #water disposal #abeton

SEE INFORMATION
CONTACT US
info@abeton.ua
IMPLEMENTATION INFORMATION
Time for completion:

2024
Place of implementation:

Kyiv, Verbova str.
General contractor:

Range of services:

Design, production, transportation