Reinforced concrete pipes for the construction of the Mostytska metro station

ABETON manufactured and supplied Abig Tig-1200×2400 reinforced concrete pipes that meet the requirements of DSTU EN 1916 for the construction of a storm sewer collector as part of the construction of the Mostytska metro station in Kyiv.

SEE THE PROJECT

IMPLEMENTATION DESCRIPTION

PROJECT DESCRIPTION

ABETON manufactured and supplied Abig Tig-1200×2400 reinforced concrete pipes that meet the requirements of DSTU EN 1916 for the construction of a storm sewer collector as part of the construction of the Mostytska metro station in Kyiv.

The implementation of this project is an important component of the development of the capital’s urban transport infrastructure. A reliable storm sewer system is a critically important element in the construction of metro facilities, as it ensures the safe operation of underground structures and protects engineering structures from the effects of ground and surface water.

TECHNICAL FEATURES OF THE PIPES

DN1200 Abig Tig-1200×2400 reinforced concrete pipes manufactured in accordance with European and national quality standards were used for the construction of the collector. These pipes feature a rebated joint and an integrated rubber seal, which ensures quick installation and network tightness.

– Manufactured in accordance with DSTU EN 1916, which guarantees the strength and durability of structures.

– High load-bearing capacity for operation in urban areas and under transport loads.

– Resistance to moisture, aggressive environments, and freeze-thaw cycles.

– The precise geometry of the products ensures quick and reliable installation of the manifold.

The construction of new metro stations is an investment in the city’s mobility, safety, and comfort of its residents. ABETON’s participation in such projects confirms the company’s ability to provide complex infrastructure facilities with proven and high-quality reinforced concrete solutions.

ABETON IS A STRONG PARTNER IN INFRASTRUCTURE CONSTRUCTION!

SEE INFORMATION
CONTACT US
info@abeton.ua
IMPLEMENTATION INFORMATION
Time for completion:

2025 р
Place of implementation:

Kyiv, Mostytska metro station
General contractor:

BIM-6
Range of services:

Design, manufacturing, transport